The track is over a trillion goes up by hundreds of billions

941

Photo: Alex Maligawa / RIA Novosti

The construction project of a highway between Dzhubga and Sochi is actually estimated at 1.6 trillion rubles compared to the previously announced 1.2 trillion. As reported TASS, said the Ministry of transport.

In the Department called the project inappropriate because it is “technically very difficult” and considerably complicate the work of the whole infrastructure, “one of the key resort regions of the country.”

“This will need to bring some sections of the railway from the coast. At the time of construction normal traffic along the coast would be seriously hampered, both road and rail”, — told in the Ministry of transport.

Earlier, Vedomosti (a newspaper owned by the family Demyan Kudryavtsev) learned that the Agency has proposed to build on the site of the serpentine from the village Dzhubga Tuapse district, Sochi Quad track length of 120 km over 1.2 trillion rubles.

The Governor of Krasnodar Krai Veniamin Kondratiev has commented on the news, saying the project is vital to the development of the region. He also felt that the coastal area of Krasnodar Krai “have long deserved such a track.”

Video, photo All from Russia.



LEAVE A REPLY

Please enter your comment!
Please enter your name here